Long story short it is possible to put steel on this type of roof but have a contractor look at it first and make sure you are not just hiding a disaster.
Putting a new roof on warped support beams.
Thick steel plate between the piston and the bottom of the load bearing post to prevent the piston from becoming embedded in the post.
Building a roof over a deck allows you to grill relax play or simply stay quiet and listen to nature whether rain or shine.
Now carefully remove the bracing and lower the porch roof on to the new beam images 3 and 4.
Remove the jack quickly and set the iron onto the entire beam.
Then secure each post rim connection with a galvanized post cap here simpson ac4z.
Span for a double 2 8 southern yellow pine beam that carries a joist span of 12 ft.
The system is similar to lapped ceiling joists but instead of lapping two joists together two individual beams join onto a larger.
But before you start determine how deep the ceiling joists are and then talk to the building inspector or a structural engineer about what size beam you ll need to carry the load.
Measure the height between the support beam and the top of the jack s lowered piston then deduct 1 2 in.
Another type of roof framing includes the use of a central beam.
Building a box around the beam won t help it s structural integrity but appearance certainly will improve.
Without bracing it is almost impossible to install trusses.
This kind of twisting is relatively common and usually is not dangerous.
Sometimes a sagging roof line can be fixed with a few new joists and osb sheeting but sometimes it is cheaper and smarter to remove the entire roof and replace with engineered trusses.
After removing the outside decking board nail a new rim to the existing rim with 16d galvanized nails.
And cut the post to length.
There are a few things to know before erecting a protective roof.
If there is a question about the holding power of the beam request an inspection by a structural engineer.
Some bracing provides a way to put up the trusses evenly while holding them and other bracing supports them after they are put up.
A roof on a treasured deck can open up more possibilities for enjoying the space throughout the year.
Then lower the jack down a little at a time so that the metal can take the weight of the roof.
Place the jack back underneath the beam but this time under the iron piece.
If you don t like seeing a beam under the ceiling it s often possible to cut a slot in the joists and put the beam up into the ceiling see fig.
The dca 6 beam span table allows a maximum 6 ft.