Copper panels come pre measured with a standard 3 x 14 feet size.
Permit for i stslling copper roof.
Get a pre inspection checklist if available.
A building permit is not required for the following repair or replacement work in non mixed use residential buildings excluding hotels.
Permitting lobby and phone hours are 8 00 a m.
Shingle roofing with slope of 5 in 12 or steeper on residential buildings with a maximum of 3 dwelling units and 3 stories.
Type if fittings ex.
They also come in 10 x 10 foot roofing squares the metal costs an average 9 per square foot and labor around 5 per square foot.
Run the strips under a row of shingles at the roof.
For example you may need to obtain a plumbing permit if you plan to install an underground lawn sprinkler.
Also remember to post your permit near your front door or worksite.
Watch this short video first.
If pex provide brand model system type.
It shows installing the copper strip on an existing roof not a.
The lee county community development department s building division is helping people seeking permits for recovery repairs and rebuilding.
Air conditioner heat pump installation f622 014 000 alteration fire safety f622 011 000 alteration polybutylene re pipe f622 053 000 alteration re roofing for low slope roofing f622 053 000 copper tubing gas line f622 046 000.
In addition to obtaining a building permit depending on the scope of your project you may need to obtain special system permits such as electrical plumbing or mechanical permits.
Erecting a small fence.
3 a letter addressed to you from the contractor s insurance carrier confirming that the specific project is covered under the roofer s worker s compensation and.
When installing copper flashing on your roof use 6 to 7 inch wide strips of copper sheeting which are available at roofing supply stores.
Welded or crimp no plot plan required.
A copper strip on each side of the roof will extend the life of asphalt shingles 40 or 50 years.
2 a written contract that specifies all of the agreed to details products and costs of the project.
Installing floor coverings or.
Beyond a water heater permit some areas may also require either an electric or plumbing permit depending on the type of water.
This can not only save money but potentially save your life if the installation was done incorrectly.
All hurricane damage related permit fees are being assessed the minimum fee regardless of their scope.
After installation an inspector will come to ensure the heater was installed correctly.
Copper vs pex if pex piping is being used a letrer from the contractor is required asking for alternate materials.
Fill out a building permit application with the following information.
Plus your roof warranty is likely void if you don t get the permit.